Electrical Installation Works for HDB at Bedok South

Electrical Installation Works for HDB at Bedok South

Project Overview

Type
Residential
Client
Yeo Wei Chin
Period
August 2025
Works
20A Aircon Isolator Installation, MCB & RCCB Installation, Power Point Installation, Cat6 Network Point Installation

Introduction

In August 2025, we were engaged by Mr Yeo, a homeowner at Bedok South, to perform urgent electrical installation works. The scope included a 20A isolator for his air-conditioning unit, new RCCB and MCB protection, single and double power points, as well as a Cat6 network point with faceplate replacement on both ends. What made this project especially challenging was the client’s urgent timeline — he reached out less than two days before his preferred installation date, requiring us to mobilize quickly without compromising safety or quality.

20A Isolator

The Challenge

Problem

Mr Yeo required essential electrical works to make his HDB home fully functional and safe for immediate use. However, the short notice posed significant scheduling and logistical challenges. Any delay in execution could have disrupted his plans, caused inconvenience, and potentially escalated costs due to coordination with other contractors. The situation demanded not only technical proficiency but also flexibility and responsiveness.

Solution

We treated this project as an opportunity to demonstrate our commitment to speed and reliability. Our licensed team immediately coordinated with the client to secure access, prepared the necessary tools and materials in advance, and streamlined our work process for efficiency.

The installations included:

  • 20A aircon isolator for safe operation of the air-conditioning unit.
  • RCCB and MCB to enhance circuit protection and improve overall electrical safety.
  • Single and double power points to provide flexible access to power.
  • Cat6 network point (with faceplate changes on both ends) to ensure stable, high-speed connectivity.

Each installation was carried out in compliance with safety standards and tested thoroughly to guarantee long-term reliability.

CCTV Installation

Key Results and Outcomes

The project was successfully completed in less than a day, achieving both immediate and lasting benefits for the client.

Key Results:

  • Delivered urgent installation within two days of request, without delays.
  • Achieved cost savings while maintaining high-quality workmanship.
  • Provided a safe, reliable, and fully functional electrical system ready for use.

Power Point Installation 1
Power Point Installation 2

Conclusion

This Bedok South project highlights our ability to deliver high-quality electrical solutions under pressing timelines. By responding swiftly to Mr Yeo’s urgent request, we not only ensured his home was fully functional on schedule but also reinforced our reputation for professionalism, safety, and efficiency.

At Mr. Electrician, we pride ourselves on being the trusted partner homeowners can rely on — whether it’s planned renovations or urgent installations, we deliver both speed and quality every time.

The price is competitive and they are available to meet my schedule despite giving them less than 2 days notice

Yeo Wei Chin
HDB Homeowner
Review fromLink to Google Review
Our Portfolio

See Our Work

We're a team of experienced professionals who are dedicated to providing the best possible service to our clients.

Want results like this?