Image
BTO Electrical Installation and LEW Testing at Tengah Park Avenue

BTO Electrical Installation and LEW Testing at Tengah Park Avenue

Project Overview

Type
Residential
Client
Ms Loo
Period
October - December 2025
Works
Lighting Installation, Power Point Installation, 20A Connection Installation, LEW Testing and Certification

Introduction

In October 2025, we were engaged by Ms Loo, a homeowner at a newly completed BTO unit in Tengah Park Avenue, to provide a comprehensive one-stop electrical solution. The scope included lighting installation, water heater connection, 15A power point installation, 20A connection, and formal LEW testing with certification. As a newly handed-over BTO unit, the client required a single licensed electrical contractor to handle all electrical works and compliance testing, eliminating the complexity of coordinating multiple vendors before move-in.

Electrical installation works at Tengah Park Avenue BTO

The Challenge

Problem

While the base electrical provisions were in place from the BTO handover, Ms Loo needed additional electrical installations to make her unit fully functional for occupancy. The challenge was not a fault-based issue but a coordination and process concern — engaging separate contractors for installation works and LEW testing would increase time, cost, and complexity. The client required assurance that all electrical work would meet regulatory and safety standards, with proper documentation for peace of mind before moving in.

Solution

We provided an integrated solution covering quotation, installation works, and LEW testing under a single engagement. Our licensed team conducted a thorough site assessment and scope confirmation before commencing work.

The installations included:

  • Lighting installation throughout the unit for improved functionality and aesthetics
  • Water heater connection with proper circuit protection
  • 15A power points for general electrical needs
  • 20A connection for higher-load appliances
  • Comprehensive system inspection and LEW testing with certification

Power point and circuit installation

All works were carried out systematically with clear coordination and minimal disruption. Electrical installations were tested immediately upon completion, ensuring compliance and safety assurance were achieved promptly.

Key Results and Outcomes

The project was successfully completed, transforming the unit from handover-ready to move-in-ready with verified safety and full regulatory compliance.

Key Results:

  • Achieved full compliance with regulatory and safety standards through LEW testing and certification
  • Eliminated safety risks by rectifying faulty or outdated wiring points
  • Optimized electrical distribution for improved load balance and system reliability
  • Delivered a fully functional living environment with documented compliance and professional handover

Completed electrical works with LEW certification

Conclusion

This Tengah Park Avenue project demonstrates our capability to provide comprehensive, one-stop electrical solutions for new BTO homeowners in Singapore. By handling installation works and LEW testing under a single engagement, we simplified the process for Ms Loo and ensured her unit was safe, compliant, and ready for occupancy.

At Mr. Electrician, we understand the importance of a seamless move-in experience. Our licensed electricians deliver professional workmanship backed by proper testing and certification, giving homeowners peace of mind from day one.

Professional and good workmanship. They offer LEW services too if you need

Ms Loo
HDB Homeowner
Review fromLink to Google Review

Project Photos

Our Portfolio

See Our Work

We're a team of experienced professionals who are dedicated to providing the best possible service to our clients.

Want results like this?