Introduction
In October 2025, we were engaged by Ms Loo, a homeowner at a newly completed BTO unit in Tengah Park Avenue, to provide a comprehensive one-stop electrical solution. The scope included lighting installation, water heater connection, 15A power point installation, 20A connection, and formal LEW testing with certification. As a newly handed-over BTO unit, the client required a single licensed electrical contractor to handle all electrical works and compliance testing, eliminating the complexity of coordinating multiple vendors before move-in.

The Challenge
Problem
While the base electrical provisions were in place from the BTO handover, Ms Loo needed additional electrical installations to make her unit fully functional for occupancy. The challenge was not a fault-based issue but a coordination and process concern — engaging separate contractors for installation works and LEW testing would increase time, cost, and complexity. The client required assurance that all electrical work would meet regulatory and safety standards, with proper documentation for peace of mind before moving in.
Solution
We provided an integrated solution covering quotation, installation works, and LEW testing under a single engagement. Our licensed team conducted a thorough site assessment and scope confirmation before commencing work.
The installations included:
- Lighting installation throughout the unit for improved functionality and aesthetics
- Water heater connection with proper circuit protection
- 15A power points for general electrical needs
- 20A connection for higher-load appliances
- Comprehensive system inspection and LEW testing with certification

All works were carried out systematically with clear coordination and minimal disruption. Electrical installations were tested immediately upon completion, ensuring compliance and safety assurance were achieved promptly.
Key Results and Outcomes
The project was successfully completed, transforming the unit from handover-ready to move-in-ready with verified safety and full regulatory compliance.
Key Results:
- Achieved full compliance with regulatory and safety standards through LEW testing and certification
- Eliminated safety risks by rectifying faulty or outdated wiring points
- Optimized electrical distribution for improved load balance and system reliability
- Delivered a fully functional living environment with documented compliance and professional handover

Conclusion
This Tengah Park Avenue project demonstrates our capability to provide comprehensive, one-stop electrical solutions for new BTO homeowners in Singapore. By handling installation works and LEW testing under a single engagement, we simplified the process for Ms Loo and ensured her unit was safe, compliant, and ready for occupancy.